Last Update: 7/21/2017 11:32 AM
This article has been moved to our new Help Center. Please update your bookmarks.

​How is the modify date calculated?

Answer:

 

When performing a migration based on date filters, MigrationWiz migrates items based on the modify date, not the creation date.

Calculation of the modify date is dependent on the Source environment. It is based either on the received date, or the date that the item was last modified (last modified date).

This article addresses the following:

  • How are the received date and the last modified date defined?
  • How are date filters set?
  • In MigrationWiz, which Source environments base their date filters on the received date, and which base their date filters on the modify date?

 

How are the received date and the last modified date defined?

  • Received date:

The received date is the date that an item was actually received. If modifications are made after the received date, the date filters are still based on the received date, not the last modified date.

Here are some example of received dates:

  • A mail item is sent to someone either internally or from an external source. The received date will equal the date that this item was received into the mailbox on the email server.
  • A meeting series was set up, with several users as invitees. The received data is the date that the series was set up. Even if changes are made to the series at a later time, the received date does not change.

 

  • Last modified date:

The modify date of an item is changed when any modification is made to the item.

Some examples of modifications:

  • If any text is changed in an item, then the modify date will be the date that the text was changed.
  • If the status of an item changes from unread to read, then the modify date will be the date that the status changed to read.
  • If an item is marked with a flag status, then the modify date will be the date that the item was flagged.
  • If an item is restored from backup, then the modify date will be the date of the item restoration.
  • If an item is moved to another folder, then the modify date will be the date of the item move.

When performing a migration based on date filters, MigrationWiz migrates items based on the modify date, not the creation date. This distinction is important, because sometimes there is confusion when a user creates an item on an earlier date, but then the modify date is changed due to actions similar to the examples listed above, and the user then expects the item to be migrated during a pass, based on the creation date.

 How are date filters set?

Date filters can be set by either of these two methods:

  • Under the MigrationWiz project Advanced Options, within the Filtering section.

date filter.PNG 

  • During a Pre-Stage Migration pass. When performing a Pre-Stage Migration pass, there is a field labeled "Migrate items whose modify date is older than". When clicking on the drop-down field labeled "Select One", the resulting drop-down list provides options to migrate items older than the last modified date.

 

Note: If date filters are set under MigrationWiz project Advanced Options, and a Pre-stage pass is performed, then MigrationWiz will perform the Pre-stage pass based on the modify date that is set within the Pre-Stage pass field, not based on the date filters that are set under the project Advanced Options (although those project Advanced Option date filters will be used during Delta migrations, when performing the Full migration pass, if they remain set).

 

In MigrationWiz, which source environments base their date filters on the received date, and which base their date filters on the modify date?

The tables below show which Source environments base their modify date on the received date, and which base their modify date on the last modified date.

 

Mailbox migrations:

​​Source​How the modify date is calculated​Notes
​Exchange 2003+​Last modified​​Includes all versions of Exchange, where the version is 2003 or later, both On-Premises and Hosted Exchange.
​​Office 365​Last modified
G Suite​Last modified
​​GroupWise​Received date
​​IMAP​Received date
​​Lotus Notes​Received date
​Open-Xchange​Received date
​​Zimbra​Received date
​​POP​Received date

 

Document migrations:

​Source​​How modify date is calculated​Notes
​Box​Last modified
​Dropbox​Last modified
​File Server​Last modified​Includes both file server home directories, and file server file shares. The Source is actually Azure, because the files are uploaded to Azure, as part of the migration process.
​Google Drive​Last modified
​Google Sites​Last modified
​OneDrive for Business​Last modified
​SharePoint​Last modified​Includes both SharePoint Online and SharePoint On-Premises.

 

Archive migrations:

​Source​How modify date is calculated​​Notes
​Exchange​Last modified​This refers to Exchange personal archive mailboxes.
​Office 365​Last modified​This refers to Office 365 archive mailboxes.
​Google Vault​Received date
​PST​Last modified

 

 Miscellaneous migrations:

​Source​How modify date is calculated​Notes
Exchange ​Public Folders​Last modified

​Includes all versions of Exchange, where the version is 2007 or later (Exchange 2003 is not supported for Public Folder migrations), both On-Premises and Hosted Exchange.

​Office 365 Public Folders​Last modified
​EML​Last modified
​AWS S3​Last modified​This refers to Amazon Web Services S3 Cloud Storage
​Azure blob storage​Last modified